Projects

H-E-B

Location
San Antonio, Texas
Project Size
24,000 SF
Completion Year
2012
HEB Stellar 03
HEB Stellar 01
HEB Stellar 04
HEB Stellar 02

Steam Plant Project Scope
Stellar built a 4,000 sf steam plant for H-E-B adjacent to its existing manufacturing operation. The facility houses three boilers and the necessary water softening, deaerating and chemical treatment systems to service the manufacturing facility. Stellar also installed a steam generator to supply sterile steam to H-E-B’s aseptic process. Additionally, Stellar replaced the bakery’s Spiral Freezer, and remodeled the refrigeration of the existing 20,000 sf bakery to include a Glycol & Chilled Water System for H-E-B.

Sprial Freezer Installation Project Scope
Stellar replaced H-E-B’s frozen dough spiral freezer with a new 12,000 pounds per hour spiral freezer. The existing egg and yeast coolers, case packaging mezzanine and holding freezer were also completely remodeled. A new 3,900 sf refrigeration machine room, including five new ammonia compressors, to support the new spiral freezer was also constructed.

Glycol & Chilled Water System Project Scope
Stellar upgraded the chilled ingredient water system by replacing the existing falling film chiller and header piping to H-E-B’s frozen dough mixers. Stellar also installed a new ammonia glycol heat exchanger chiller package to provide a jacketed cooling system to various mixers. A new controls system was also part of this project.

Key Team Members

Stellar's leadership has the expertise and understanding necessary to advise you, even on the most complex challenges.

Meet Stellar's Leadership Team
Next Slide